After-sales Service: | Field Installation, Commissioning and Training |
---|---|
Warranty: | 1year |
Certification: | CE, MET, SA8000, ISO9001 |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
a. Raw Materials: adopts corn flour, rice powder as raw materials
b. Products: different shapes are made by adjusting the dies from extruder
c. Capacity: 150kg/h, 240kg/h, 500kg/h
d. Flow chart:
Mixing system---Extrusion system---Drying system---Flavoring system---Packing system
e. Voltage in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries
f. Machines Materials: All the nutritive powder making machine are made by stainless steel, this line is with reasonable design and with high automation; the screws are made by alloy steel, with building block system structure and self-cleaning function
g. Technical Parameters
Model |
Installed power |
Real power |
Output |
Dimension |
KLD85 |
145kw |
100kw |
500-600kg/h |
20000x2000x3500mm |
KLD90 |
135kw |
90kw |
800-1500kg/h |
22000x2000x3500mm |
KLD95 |
155kw |
110kw |
1500-2000kg/h |
24000x3500x4500mm |
1).Packaging: daub coal oil on the surface to protect the machine from moisture, Then cover with plastic film. Finally pack them with wooden case.
2)Customer's requirement is available.
3).If you want to know the transportation cost: by air-please tell me your airport name; by express-please tell me your detailed address(including zip code, house number, street, city, country); by ship-please tell me your delivery port.
Jinan Kelid Machinery Co., Ltd. Is a professional supplier of microwave oven.Our company's motto is:"technology makes easy".We offer to cooperate with our customers for mutual and beneficial development.
FAQ
1. What's the materials?
Answer: Stainless steel
2. How long is your guarantee time?
Answer: One year after comissioning.
3.How is the installation?
Answer: When the machine arrives at the your workshop, we send 2 engineers to install the machine and teach the workers how to use. There be a operate mannual and Equipment maintenance manual.
4.How is the payment?
Answer: 40% TT as downpayment, 60% TT or L/C before shippment. Before shippment,welcome to inspect the machine.
Suppliers with verified business licenses